PERFORMANCE

69kV cross-linked PE cable and ancillary equipment (purchase and installation) - Mili ~ Meinong red line - cable key equipment installation

69kV交連PE電纜及附屬器材(購置暨安裝)-瀰力~美濃紅線-電纜關鍵性器材安裝

  • 主辦單位/ORGANIZER

    台灣電力公司

    TAIWAN POWER COMPANY

  • 業主/OWNER

    大同股份有限公司

    TATUNG COMPANY

  • 施工數量/QUANTITY

    EBG-IEC 3 st 
    IJ 63 st
    NJ 30 st

  • 年度/YEAR

    2017

With Ho Lung’s company purpose “Obedience, Responsibility, Honor”, we have been laying a solid foundation of Power Engineering with continuing on-the-job training and personnel training. Ho Lung develops solar energy and wind power engineering to contribute a world with green energy. Also, dedicates to grasp the market pulse to be a sustainable corporation.

Mail

DUNS.png

Copyright© 2019 HO LUNG POWER ENGINEERING CO., LTD.  All Rights Reserved.  Design By DREAM DESIGN