top of page

PERFORMANCE

161kV 2000mm2 cross-linked PE cable and ancillary equipment purchase and installation (Nanke ~,TSMC E8, Heshun D/S, Dapeng E/S, Wangxing D/S and other lines)

161kV 2000mm²交連PE電纜及附屬器材購置暨安裝工程(南科-積E八、和順D/S、大鵬E/S、王行D/S等線路)

  • 主辦單位/ORGANIZER

    台灣電力公司

    TAIWAN POWER COMPANY

  • 業主/OWNER

    大東電業廠股份有限公司

    TA-TUN ELECTRIC WIRE & CABLE CO., LTD.

  • 施工數量/QUANTITY

    EBG-IEC 45 st 
    EBA 27 st
    IJ 30 st
    NJ 12 st
     EBO 9 st

  • 年度/YEAR

    2018

LOGO-10.png
​合隆電工有限公司 Ho Lung Power Engineering Co., Ltd.
合隆能源有限公司 Ho Lung Power Energy Co., Ltd.

With Ho Lung’s company purpose “Obedience, Responsibility, Honor”, we have been laying a solid foundation of Power Engineering with continuing on-the-job training and personnel training. Ho Lung develops Solar Energy and Wind Power Engineering to contribute a world with green energy. Also, dedicates to grasp the market pulse to be a sustainable corporation.

TEL

高雄總部

Kaohsiung Headquarter 

+886-7-6621493 (中文)

台中辦公室

Taichung Office

+886-4-22520689 (English)

FAX

高雄總部

Kaohsiung Headquarter 

+886-7-6622801

Mail

TR-icon-01.png
DUNS.png

Copyright© 2019 HO LUNG POWER. All Rights Reserved.

中文
bottom of page