PERFORMANCE

161kV cross-linked PE cable and ancillary equipment purchase and installation (Zhugong ~Xinlun (Zhugong E/S~M13))

161kV交連PE電纜及附屬器材購置暨安裝(竹工~新崙(竹工E/S~M13))

  • 主辦單位/ORGANIZER

    台灣電力公司

    TAIWAN POWER COMPANY

  • 業主/OWNER

    大同股份有限公司

    TATUNG COMPANY 

  • 施工數量/QUANTITY

    EBG-IEC 12 st 
    IJ 114 st
    NJ 54 st

  • 年度/YEAR

    2011

With Ho Lung’s company purpose “Obedience, Responsibility, Honor”, we have been laying a solid foundation of Power Engineering with continuing on-the-job training and personnel training. Ho Lung develops solar energy and wind power engineering to contribute a world with green energy. Also, dedicates to grasp the market pulse to be a sustainable corporation.

Mail

DUNS.png

Copyright© 2019 HO LUNG POWER ENGINEERING CO., LTD.  All Rights Reserved.  Design By DREAM DESIGN