PERFORMANCE

345kV cross-linked PE cable and ancillary equipment installation for temporary connection transformers of Tongxiao Power Plant

通霄電廠臨時連絡變壓器移設工程345kV交連PE電纜及附屬設備工程

  • 主辦單位/ORGANIZER

    台灣電力公司

    TAIWAN POWER COMPANY

  • 業主/OWNER

    大東電業廠股份有限公司

    TA-TUN ELECTRIC WIRE & CABLE CO., LTD.

  • 施工數量/QUANTITY

    EBG-IEC 12 st

  • 年度/YEAR

    2018-2019

With Ho Lung’s company purpose “Obedience, Responsibility, Honor”, we have been laying a solid foundation of Power Engineering with continuing on-the-job training and personnel training. Ho Lung develops solar energy and wind power engineering to contribute a world with green energy. Also, dedicates to grasp the market pulse to be a sustainable corporation.

Mail

DUNS.png

Copyright© 2019 HO LUNG POWER ENGINEERING CO., LTD.  All Rights Reserved.  Design By DREAM DESIGN