PERFORMANCE

Kaohsiung EHV Substation 345kV Reactor power cable and ancillary equipment installation  

高雄超高壓變電所345kV電抗器用電力電纜及附屬設備安裝工程

  • 主辦單位/ORGANIZER

    台灣電力公司

    TAIWAN POWER COMPANY

  • 業主/OWNER

    合機電線電纜股份有限公司

    HOLD KEY ELECTRIC WIRE & CABLE, CO. LTD.

  • 施工數量/QUANTITY

    EBG-IEC 6 st

  • 年度/YEAR

    2012-2013

With Ho Lung’s company purpose “Obedience, Responsibility, Honor”, we have been laying a solid foundation of Power Engineering with continuing on-the-job training and personnel training. Ho Lung develops solar energy and wind power engineering to contribute a world with green energy. Also, dedicates to grasp the market pulse to be a sustainable corporation.

Mail

DUNS.png

Copyright© 2019 HO LUNG POWER ENGINEERING CO., LTD.  All Rights Reserved.  Design By DREAM DESIGN