top of page

NEWS

Zhong Neng Offshore Wind Farm Project

Zhong Neng Offshore Wind Farm Project will be located 10km to 17km offshore from the west coast of Changhua in central Taiwan, adjacent to Changfang and Xidao Offshore Wind Farm. Zhong Neng Offshore Wind Farm development will feature 31 WTGs, each of which is rated to 9.5 MW. Ho Lung will provide cable installation and testing services in transition joint bay.



Comments


LOGO-10.png
​合隆電工有限公司 Ho Lung Power Engineering Co., Ltd.
合隆能源有限公司 Ho Lung Power Energy Co., Ltd.

With Ho Lung’s company purpose “Obedience, Responsibility, Honor”, we have been laying a solid foundation of Power Engineering with continuing on-the-job training and personnel training. Ho Lung develops Solar Energy and Wind Power Engineering to contribute a world with green energy. Also, dedicates to grasp the market pulse to be a sustainable corporation.

TEL

高雄總部

Kaohsiung Headquarter 

+886-7-6621493 (中文)

台中辦公室

Taichung Office

+886-4-22520689 (English)

FAX

高雄總部

Kaohsiung Headquarter 

+886-7-6622801

Mail

TR-icon-01.png
DUNS.png

Copyright© 2019 HO LUNG POWER. All Rights Reserved.

中文
bottom of page