Changfang and Xidao Offshore Wind Farm Project is located 14km to 25km off the coast Changhua County, Taiwan. The Project consists of 62 WTGs, each of which is rated to 9.5 MW. Ho Lung was the first local supplier in Taiwan certified by foreign cable manufacturer and conducted offshore/onshore cable installation and testing in transition joint bay. The project is expected to be connected to the grid for power supply from 2023.
top of page
bottom of page
Comments