- IN ORDER TO CONQUER FUTURE CHALLENGES -

Safety

Quality

Efficiency

electric power

Transmission (underground cable)

& Distribution

Design & Installation

of

heavy electric power transformer

power cable

Laying & Connecting

related engineering

Test of
DC/AC voltage withstand
insulation resistance
power quality

​Equipment trading

of electric power transmission,

distribution and transformer:

domestic, occidental, Japanese & Korean system.

The total length of Taiwan is 394 km......

Cape Fuguei

394 km

Cape Eluanbi

We have completed Laying Engineering

1,087 km

x2.7(times)

2,297 km

x5.8 (times)

36 km

x0.1 (times)

unit: times/length of Taiwan island

Performance

Our achievement of getting ISO2000 certified resulted from our continuous efforts in quality improvement.

However, we are not satisfied with this.

 

We will continue our focus on quality, and keep on improving, in order to meet customer’s requirements.

Read More

With Ho Lung’s company purpose “Obedience, Responsibility, Honor”, we have been laying a solid foundation of Power Engineering with continuing on-the-job training and personnel training. Ho Lung develops solar energy and wind power engineering to contribute a world with green energy. Also, dedicates to grasp the market pulse to be a sustainable corporation.

Mail

DUNS.png

Copyright© 2019 HO LUNG POWER ENGINEERING CO., LTD.  All Rights Reserved.  Design By DREAM DESIGN