OBEDIENCE | RESPONSIBILITY | HONOR
- IN ORDER TO CONQUER FUTURE CHALLENGES -
SERVICE
Electric Power System
Transmission (underground cable)
& Distribution System.
Power Cable and FO Cable Installation
Laying, Jointing,
and Terminating.
Electric Quality Test
DC/AC Voltage Withstand,
Insulation Resistance,
and so on.
Design & Installation
of
Cable System and
Heavy Electric Power Transformer.
Equipment Trading
of Electric Power Transmission,
Distribution, and Transformer:
Domestic, Occidental, Japanese & Korean System.
The total length of Taiwan is 394 km......
Cape Fuguei
394 km
Cape Eluanbi
We have completed Laying Engineering
1,087 km
x2.7(times)
2,297 km
x5.8 (times)
36 km
x0.1 (times)
unit: times/length of Taiwan island
Performance
Our achievement of getting certifications of ISO9001 Quality management systems and ISO45001 Occupational Health and Safety Management Systems resulted from our continuous efforts in quality improvement.
However, we are not satisfied with this.
We will continue our focus on quality, and keep on improving, in order to meet customer’s requirements.
Read More